Le Havre · Carbon Capture & Storage (CCS)
Valves for Carbon Capture & Storage (CCS) - Le Havre
Le Havre in Normandy is a major French industrial and port centre anchored by the TotalEnergies Normandy refinery at Gonfreville-l'Orcher (around 247,000 bpd) and its integrated petrochemical platform, together with Chevron Oronite additives, Yara fertiliser, and the vast HAROPA Port of Le Havre - France's leading container port and a growing offshore-wind fabrication base; refinery, petrochemical, and chemical service demands PED 2014/68/EU-compliant valves with CE marking - API 6D and EN-standard ball, gate, and globe valves in A216 WCB and A351 CF8M, NACE valves for sour and hydrotreating service, high-temperature WC9 and F22 valves for reformer, hydrocracker, and FCC duty, fire-safe API 607 / ISO 10497 valves, PTFE- and PFA-lined valves for corrosive chemical and additive service, low-fugitive ISO 15848 / TA-Luft valves, and API 526 / EN ISO 4126 safety-relief valves; EN 1092-1 flanges, PED conformity, and EN 10204 3.1 MTCs are required; Vajra Industrial Solutions supplies Le Havre refinery, petrochemical, chemical, and offshore-wind buyers with PED/CE-compliant API 6D, NACE, fire-safe, lined, and low-fugitive valve packages with full export documentation and EUR.1 customs support.
SS316L gate and globe valves for amine absorber CO₂ capture, Class 900 Duplex ball valves for supercritical CO₂ compression and transport, and NACE-compliant valves for CO₂ geological storage.
Carbon Capture & Storage (CCS) Valves - Available in Le Havre
Globe Valve (Amine Service)
Class 150 / 300Lean/rich amine absorber and stripper - hot amine (MEA/MDEA) is corrosive; SS316L with Stellite trim for erosion control
Ball Valve (Supercritical CO₂)
Class 600 / 900CO₂ compressor outlet and injection well isolation - supercritical CO₂ (> 73 bar) is an excellent solvent; seals must be CO₂-compatible
Gate Valve (CO₂ Pipeline)
Class 300 / 600 / 900CO₂ trunk pipeline isolation - API 6D full-bore gate valves; same specification as natural gas pipelines but with CO₂-compatible seals
Check Valve (CO₂ Compressor)
Class 300 / 600CO₂ compressor inter-stage and discharge back-flow prevention
Carbon Capture & Storage (CCS) Industry in Le Havre
Le Havre in Normandy is a major French industrial and port centre anchored by the TotalEnergies Normandy refinery at Gonfreville-l'Orcher (around 247,000 bpd) and its integrated petrochemical platform, together with Chevron Oronite additives, Yara fertiliser, and the vast HAROPA Port of Le Havre - France's leading container port and a growing offshore-wind fabrication base; refinery, petrochemical, and chemical service demands PED 2014/68/EU-compliant valves with CE marking - API 6D and EN-standard ball, gate, and globe valves in A216 WCB and A351 CF8M, NACE valves for sour and hydrotreating service, high-temperature WC9 and F22 valves for reformer, hydrocracker, and FCC duty, fire-safe API 607 / ISO 10497 valves, PTFE- and PFA-lined valves for corrosive chemical and additive service, low-fugitive ISO 15848 / TA-Luft valves, and API 526 / EN ISO 4126 safety-relief valves; EN 1092-1 flanges, PED conformity, and EN 10204 3.1 MTCs are required; Vajra Industrial Solutions supplies Le Havre refinery, petrochemical, chemical, and offshore-wind buyers with PED/CE-compliant API 6D, NACE, fire-safe, lined, and low-fugitive valve packages with full export documentation and EUR.1 customs support.
Critical Valve Requirements
Why Le Havre's Refining (TotalEnergies Normandy Refinery - 247,000 bpd, one of France's largest) Sector Needs Carbon Capture & Storage (CCS) Valves
Le Havre in Normandy is a major French industrial and port centre anchored by the TotalEnergies Normandy refinery at Gonfreville-l'Orcher (around 247,000 bpd) and its integrated petrochemical platform, together with Chevron Oronite additives, Yara fertiliser, and the vast HAROPA Port of Le Havre - France's leading container port and a growing offshore-wind fabrication base; refinery, petrochemical, and chemical service demands PED 2014/68/EU-compliant valves with CE marking - API 6D and EN-standard ball, gate, and globe valves in A216 WCB and A351 CF8M, NACE valves for sour and hydrotreating service, high-temperature WC9 and F22 valves for reformer, hydrocracker, and FCC duty, fire-safe API 607 / ISO 10497 valves, PTFE- and PFA-lined valves for corrosive chemical and additive service, low-fugitive ISO 15848 / TA-Luft valves, and API 526 / EN ISO 4126 safety-relief valves; EN 1092-1 flanges, PED conformity, and EN 10204 3.1 MTCs are required; Vajra Industrial Solutions supplies Le Havre refinery, petrochemical, chemical, and offshore-wind buyers with PED/CE-compliant API 6D, NACE, fire-safe, lined, and low-fugitive valve packages with full export documentation and EUR.1 customs support. Key facilities in the Le Havre area - including TotalEnergies Normandy Refinery and petrochemical platform (Gonfreville), Port of Le Havre / HAROPA industrial zone, Chevron Oronite and Yara chemical plants - rely on Globe Valve (Amine Service) for their refining (totalenergies normandy refinery - 247,000 bpd, one of france's largest) operations. Vajra Industrial Solutions supplies Globe Valve (Amine Service), Ball Valve (Supercritical CO₂), Gate Valve (CO₂ Pipeline), Check Valve (CO₂ Compressor) for carbon capture & storage (ccs) projects across Normandy, with full NACE MR0175 / ISO 15156 (sour CO₂) and ASME B16.34 compliance documentation - EN 10204 3.1 material test certificates, API 598 pressure test reports, and third-party inspection co-ordination available for every order.
Delivery to Le Havre
Vajra Industrial Solutions offers export documentation and delivery to Le Havre in 7–14 business days. Emergency dispatch available for plant shutdowns and critical site requirements.
Also serving: TotalEnergies Normandy Refinery and petrochemical platform (Gonfreville), Port of Le Havre / HAROPA industrial zone, Chevron Oronite and Yara chemical plants, Le Havre offshore-wind and turbine fabrication hub
FAQ - Carbon Capture & Storage (CCS) Valves in Le Havre
Do you supply carbon capture & storage (ccs) valves in Le Havre?
What certifications are required for carbon capture & storage (ccs) valves in Le Havre?
What is the delivery time for carbon capture & storage (ccs) valves to Le Havre?
Can carbon steel valves be used in CO₂ service?
What is the difference between CCS and carbon capture for enhanced oil recovery (CO₂-EOR)?
Other Application Guides for Le Havre
Get a Quote
Carbon Capture & Storage (CCS) Valves - Le Havre
Send your specification - quote within 24 hours with full documentation.
Standards
Product Categories