Angola
Export Supply

Butterfly Valves for Angola

Butterfly Valves export to Angola (Africa) — API 6D / ASME B16.34 certified, supplied to Angola operators and EPC projects with full export documentation and a 24-hour quote.

Who supplies butterfly valves to Angola?

Vajra Industrial Solutions is a valve manufacturer exporting butterfly valves to Angola to API 6D and ASME B16.34, with full export documentation (certificate of origin, third-party inspection, EN 10204 3.1 MTCs). Shipments to Angola dispatched within 5–7 business days. Air freight to Luanda (LAD): 3–5 days transit via Addis Ababa (ET) or Doha (QR). Sea freight via JNPT or Mundra to Luanda Port: approximately 20–25 days. Export documentation: commercial invoice, packing list, certificate of origin (India), MSDS, full API/ASME mill test certificates. Angola customs require EUROCERT or SGS pre-shipment inspection for orders above USD 10,000.

Angola Operators & EPC End-Users

SonangolTotalEnergies AngolaChevron Angola (Cabinda)BP AngolaExxonMobil AngolaEni AngolaAngola LNG (Soyo)Halliburton AngolaSaipem AngolaModec (FPSO)

Key Butterfly Valves Markets in Angola

  • Oil & Gas (Sonangol, TotalEnergies, Chevron, BP, ExxonMobil)
  • Deepwater & FPSO Operations (Blocks 0, 15, 17, 18, 32)
  • LNG (Angola LNG - Soyo, 5.2 MTPA)
  • Oil Refining (Luanda Refinery + Lobito Refinery under construction)
  • Diamond Mining (Catoca, Lulo)
  • EPC & Oilfield Services (Halliburton, Schlumberger, Saipem)

Vajra Butterfly Valves

Compact and efficient butterfly valves for large-scale flow control and isolation.

See the full Butterfly Valves range

Butterfly Valves delivery across Angola

Other valves for Angola

Butterfly Valves export to other countries

Reviewed by Product Engineering, Vajra Industrial SolutionsDiscipline: Valve Product EngineeringLast reviewed: 20 June 2026

Connected Engineering

Exporting butterfly valves to Angola?

Send your enquiry or line list — we supply butterfly valves to Angola with API 6D / ASME B16.34 certification and full export documentation in 24 hours.

Relevant Products

Engineering references