Gurugram · Carbon Capture & Storage (CCS)
Valves for Carbon Capture & Storage (CCS) — Gurugram
NCR's corporate hub with IMT Manesar hosting Maruti Suzuki, Honda, Hero and hundreds of EPC/PMC companies procuring valves for projects nationwide.
SS316L gate and globe valves for amine absorber CO₂ capture, Class 900 Duplex ball valves for supercritical CO₂ compression and transport, and NACE-compliant valves for CO₂ geological storage.
Carbon Capture & Storage (CCS) Valves — Available in Gurugram
Globe Valve (Amine Service)
Class 150 / 300Lean/rich amine absorber and stripper — hot amine (MEA/MDEA) is corrosive; SS316L with Stellite trim for erosion control
Ball Valve (Supercritical CO₂)
Class 600 / 900CO₂ compressor outlet and injection well isolation — supercritical CO₂ (> 73 bar) is an excellent solvent; seals must be CO₂-compatible
Gate Valve (CO₂ Pipeline)
Class 300 / 600 / 900CO₂ trunk pipeline isolation — API 6D full-bore gate valves; same specification as natural gas pipelines but with CO₂-compatible seals
Check Valve (CO₂ Compressor)
Class 300 / 600CO₂ compressor inter-stage and discharge back-flow prevention
Carbon Capture & Storage (CCS) Industry in Gurugram
NCR's corporate hub with IMT Manesar hosting Maruti Suzuki, Honda, Hero and hundreds of EPC/PMC companies procuring valves for projects nationwide.
Critical Valve Requirements
Why Gurugram's Manufacturing Sector Needs Carbon Capture & Storage (CCS) Valves
NCR's corporate hub with IMT Manesar hosting Maruti Suzuki, Honda, Hero and hundreds of EPC/PMC companies procuring valves for projects nationwide. Key facilities in the Gurugram area — including IMT Manesar, Udyog Vihar, Dharuhera Industrial Belt — rely on Globe Valve (Amine Service) for their manufacturing operations. Vajra Industrial Solutions supplies Globe Valve (Amine Service), Ball Valve (Supercritical CO₂), Gate Valve (CO₂ Pipeline), Check Valve (CO₂ Compressor) for carbon capture & storage (ccs) projects across Haryana, with full NACE MR0175 / ISO 15156 (sour CO₂) and ASME B16.34 compliance documentation — EN 10204 3.1 material test certificates, API 598 pressure test reports, and third-party inspection co-ordination available for every order.
Delivery to Gurugram
Vajra Industrial Solutions offers delivery to Gurugram in 3–7 business days. Emergency dispatch available for plant shutdowns and critical site requirements.
Also serving: IMT Manesar, Udyog Vihar, Dharuhera Industrial Belt
FAQ — Carbon Capture & Storage (CCS) Valves in Gurugram
Do you supply carbon capture & storage (ccs) valves in Gurugram?
What certifications are required for carbon capture & storage (ccs) valves in Gurugram?
What is the delivery time for carbon capture & storage (ccs) valves to Gurugram?
Can carbon steel valves be used in CO₂ service?
What is the difference between CCS and carbon capture for enhanced oil recovery (CO₂-EOR)?
Other Application Guides for Gurugram
Get a Quote
Carbon Capture & Storage (CCS) Valves — Gurugram
Send your specification — quote within 24 hours with full documentation.
Standards
Product Categories