Jakarta · Geothermal Power Plants
Valves for Geothermal Power Plants — Jakarta
Indonesia is a top-5 coal producer and major LNG exporter — Pertamina and VICO supply chains span the archipelago.
Duplex 2205 wellhead isolation ball valves, NACE MR0175 gate valves for H₂S-containing geothermal brine, and IBR-certified steam valves for geothermal power generation.
Geothermal Power Plants Valves — Available in Jakarta
Ball Valve (Duplex 2205)
Class 600 / 900Wellhead isolation and Christmas tree — sour brine (H₂S + CO₂ + Cl⁻) at 200–300°C; fire-safe, anti-static
Gate Valve (NACE MR0175)
Class 300 / 600Brine pipeline isolation and separator inlet — sour H₂S service; Class 300–600
Butterfly Valve (SS316L)
Class 150 / 300Geothermal brine reinjection headers (large bore, moderate pressure), cooling water, and condensate service
Gate Valve (IBR Steam)
Class 150 / 300Geothermal steam turbine inlet isolation and extraction steam — IBR mandatory in Indian geothermal projects
Geothermal Power Plants Industry in Jakarta
Indonesia is a top-5 coal producer and major LNG exporter — Pertamina and VICO supply chains span the archipelago.
Critical Valve Requirements
Why Jakarta's Oil & Gas Sector Needs Geothermal Power Plants Valves
Indonesia is a top-5 coal producer and major LNG exporter — Pertamina and VICO supply chains span the archipelago. Key facilities in the Jakarta area — including Cikarang Industrial Estate, Karawang Industrial City, JIIPE Gresik — rely on Ball Valve (Duplex 2205) for their water treatment operations. Vajra Industrial Solutions supplies Ball Valve (Duplex 2205), Gate Valve (NACE MR0175), Butterfly Valve (SS316L), Gate Valve (IBR Steam) for geothermal power plants projects across DKI Jakarta, with full NACE MR0175 / ISO 15156 and ASME B16.34 compliance documentation — EN 10204 3.1 material test certificates, API 598 pressure test reports, and third-party inspection co-ordination available for every order.
Delivery to Jakarta
Vajra Industrial Solutions offers export documentation and delivery to Jakarta in 7–14 business days. Emergency dispatch available for plant shutdowns and critical site requirements.
Also serving: Cikarang Industrial Estate, Karawang Industrial City, JIIPE Gresik
FAQ — Geothermal Power Plants Valves in Jakarta
Do you supply geothermal power plants valves in Jakarta?
What certifications are required for geothermal power plants valves in Jakarta?
What is the delivery time for geothermal power plants valves to Jakarta?
What material is recommended for geothermal brine with high H₂S?
How does silica scaling affect valve selection for geothermal brine?
Other Application Guides for Jakarta
Get a Quote
Geothermal Power Plants Valves — Jakarta
Send your specification — quote within 24 hours with full documentation.
Standards
Product Categories