Jeddah · Carbon Capture & Storage (CCS)
Valves for Carbon Capture & Storage (CCS) — Jeddah
Jeddah's port is Saudi Arabia's largest import gateway — ideal for valve distribution across the Kingdom.
SS316L gate and globe valves for amine absorber CO₂ capture, Class 900 Duplex ball valves for supercritical CO₂ compression and transport, and NACE-compliant valves for CO₂ geological storage.
Carbon Capture & Storage (CCS) Valves — Available in Jeddah
Globe Valve (Amine Service)
Class 150 / 300Lean/rich amine absorber and stripper — hot amine (MEA/MDEA) is corrosive; SS316L with Stellite trim for erosion control
Ball Valve (Supercritical CO₂)
Class 600 / 900CO₂ compressor outlet and injection well isolation — supercritical CO₂ (> 73 bar) is an excellent solvent; seals must be CO₂-compatible
Gate Valve (CO₂ Pipeline)
Class 300 / 600 / 900CO₂ trunk pipeline isolation — API 6D full-bore gate valves; same specification as natural gas pipelines but with CO₂-compatible seals
Check Valve (CO₂ Compressor)
Class 300 / 600CO₂ compressor inter-stage and discharge back-flow prevention
Carbon Capture & Storage (CCS) Industry in Jeddah
Jeddah's port is Saudi Arabia's largest import gateway — ideal for valve distribution across the Kingdom.
Critical Valve Requirements
Why Jeddah's Petrochemical Sector Needs Carbon Capture & Storage (CCS) Valves
Jeddah's port is Saudi Arabia's largest import gateway — ideal for valve distribution across the Kingdom. Key facilities in the Jeddah area — including Jeddah Islamic Port, SABIC Yanbu, MAADEN — rely on Globe Valve (Amine Service) for their petrochemical operations. Vajra Industrial Solutions supplies Globe Valve (Amine Service), Ball Valve (Supercritical CO₂), Gate Valve (CO₂ Pipeline), Check Valve (CO₂ Compressor) for carbon capture & storage (ccs) projects across Makkah, with full NACE MR0175 / ISO 15156 (sour CO₂) and ASME B16.34 compliance documentation — EN 10204 3.1 material test certificates, API 598 pressure test reports, and third-party inspection co-ordination available for every order.
Delivery to Jeddah
Vajra Industrial Solutions offers export documentation and delivery to Jeddah in 7–14 business days. Emergency dispatch available for plant shutdowns and critical site requirements.
Also serving: Jeddah Islamic Port, SABIC Yanbu, MAADEN
FAQ — Carbon Capture & Storage (CCS) Valves in Jeddah
Do you supply carbon capture & storage (ccs) valves in Jeddah?
What certifications are required for carbon capture & storage (ccs) valves in Jeddah?
What is the delivery time for carbon capture & storage (ccs) valves to Jeddah?
Can carbon steel valves be used in CO₂ service?
What is the difference between CCS and carbon capture for enhanced oil recovery (CO₂-EOR)?
Other Application Guides for Jeddah
Get a Quote
Carbon Capture & Storage (CCS) Valves — Jeddah
Send your specification — quote within 24 hours with full documentation.
Standards
Product Categories