Lisbon · Carbon Capture & Storage (CCS)
Valves for Carbon Capture & Storage (CCS) — Lisbon
Lisbon is the procurement base for Galp Energia — Portugal's national oil and gas company operating the Sines Refinery and SINES LNG terminal (Europe's second-largest LNG import terminal at 7 bcm/yr); Galp's upstream E&P activities in Brazil (Santos Basin pre-salt) and Mozambique (Coral South FLNG) are also procured and managed from Lisbon; Vajra Industrial Solutions supplies PED 2014/68/EU certified API 6D ball valves and gate valves for Galp's Portuguese refinery and LNG projects, cryogenic LNG ball valves for SINES terminal maintenance, and stainless steel butterfly valves for Lisbon's water distribution infrastructure.
SS316L gate and globe valves for amine absorber CO₂ capture, Class 900 Duplex ball valves for supercritical CO₂ compression and transport, and NACE-compliant valves for CO₂ geological storage.
Carbon Capture & Storage (CCS) Valves — Available in Lisbon
Globe Valve (Amine Service)
Class 150 / 300Lean/rich amine absorber and stripper — hot amine (MEA/MDEA) is corrosive; SS316L with Stellite trim for erosion control
Ball Valve (Supercritical CO₂)
Class 600 / 900CO₂ compressor outlet and injection well isolation — supercritical CO₂ (> 73 bar) is an excellent solvent; seals must be CO₂-compatible
Gate Valve (CO₂ Pipeline)
Class 300 / 600 / 900CO₂ trunk pipeline isolation — API 6D full-bore gate valves; same specification as natural gas pipelines but with CO₂-compatible seals
Check Valve (CO₂ Compressor)
Class 300 / 600CO₂ compressor inter-stage and discharge back-flow prevention
Carbon Capture & Storage (CCS) Industry in Lisbon
Lisbon is the procurement base for Galp Energia — Portugal's national oil and gas company operating the Sines Refinery and SINES LNG terminal (Europe's second-largest LNG import terminal at 7 bcm/yr); Galp's upstream E&P activities in Brazil (Santos Basin pre-salt) and Mozambique (Coral South FLNG) are also procured and managed from Lisbon; Vajra Industrial Solutions supplies PED 2014/68/EU certified API 6D ball valves and gate valves for Galp's Portuguese refinery and LNG projects, cryogenic LNG ball valves for SINES terminal maintenance, and stainless steel butterfly valves for Lisbon's water distribution infrastructure.
Critical Valve Requirements
Why Lisbon's Oil Refining (Galp) Sector Needs Carbon Capture & Storage (CCS) Valves
Lisbon is the procurement base for Galp Energia — Portugal's national oil and gas company operating the Sines Refinery and SINES LNG terminal (Europe's second-largest LNG import terminal at 7 bcm/yr); Galp's upstream E&P activities in Brazil (Santos Basin pre-salt) and Mozambique (Coral South FLNG) are also procured and managed from Lisbon; Vajra Industrial Solutions supplies PED 2014/68/EU certified API 6D ball valves and gate valves for Galp's Portuguese refinery and LNG projects, cryogenic LNG ball valves for SINES terminal maintenance, and stainless steel butterfly valves for Lisbon's water distribution infrastructure. Key facilities in the Lisbon area — including Galp Matosinhos Refinery (Porto, co-procurement), SINES LNG Terminal (Sines, 160 km south — 7 bcm/yr), Petrogal / Galp Lisbon HQ — rely on Globe Valve (Amine Service) for their oil refining (galp) operations. Vajra Industrial Solutions supplies Globe Valve (Amine Service), Ball Valve (Supercritical CO₂), Gate Valve (CO₂ Pipeline), Check Valve (CO₂ Compressor) for carbon capture & storage (ccs) projects across Lisbon District, with full NACE MR0175 / ISO 15156 (sour CO₂) and ASME B16.34 compliance documentation — EN 10204 3.1 material test certificates, API 598 pressure test reports, and third-party inspection co-ordination available for every order.
Delivery to Lisbon
Vajra Industrial Solutions offers export documentation and delivery to Lisbon in 7–14 business days. Emergency dispatch available for plant shutdowns and critical site requirements.
Also serving: Galp Matosinhos Refinery (Porto, co-procurement), SINES LNG Terminal (Sines, 160 km south — 7 bcm/yr), Petrogal / Galp Lisbon HQ, EDP Renováveis (energy), Brisa / infrastructure procurement
FAQ — Carbon Capture & Storage (CCS) Valves in Lisbon
Do you supply carbon capture & storage (ccs) valves in Lisbon?
What certifications are required for carbon capture & storage (ccs) valves in Lisbon?
What is the delivery time for carbon capture & storage (ccs) valves to Lisbon?
Can carbon steel valves be used in CO₂ service?
What is the difference between CCS and carbon capture for enhanced oil recovery (CO₂-EOR)?
Other Application Guides for Lisbon
Get a Quote
Carbon Capture & Storage (CCS) Valves — Lisbon
Send your specification — quote within 24 hours with full documentation.
Standards
Product Categories