Mangalore · Carbon Capture & Storage (CCS)
Valves for Carbon Capture & Storage (CCS) — Mangalore
Mangalore Refinery and Petrochemicals Ltd (MRPL) and the country's third-largest seaport create strong demand for butterfly, ball and globe valves along the Karnataka coast.
SS316L gate and globe valves for amine absorber CO₂ capture, Class 900 Duplex ball valves for supercritical CO₂ compression and transport, and NACE-compliant valves for CO₂ geological storage.
Carbon Capture & Storage (CCS) Valves — Available in Mangalore
Globe Valve (Amine Service)
Class 150 / 300Lean/rich amine absorber and stripper — hot amine (MEA/MDEA) is corrosive; SS316L with Stellite trim for erosion control
Ball Valve (Supercritical CO₂)
Class 600 / 900CO₂ compressor outlet and injection well isolation — supercritical CO₂ (> 73 bar) is an excellent solvent; seals must be CO₂-compatible
Gate Valve (CO₂ Pipeline)
Class 300 / 600 / 900CO₂ trunk pipeline isolation — API 6D full-bore gate valves; same specification as natural gas pipelines but with CO₂-compatible seals
Check Valve (CO₂ Compressor)
Class 300 / 600CO₂ compressor inter-stage and discharge back-flow prevention
Carbon Capture & Storage (CCS) Industry in Mangalore
Mangalore Refinery and Petrochemicals Ltd (MRPL) and the country's third-largest seaport create strong demand for butterfly, ball and globe valves along the Karnataka coast.
Critical Valve Requirements
Why Mangalore's Petroleum Refining Sector Needs Carbon Capture & Storage (CCS) Valves
Mangalore Refinery and Petrochemicals Ltd (MRPL) and the country's third-largest seaport create strong demand for butterfly, ball and globe valves along the Karnataka coast. Key facilities in the Mangalore area — including MRPL Refinery, New Mangalore Port, Baikampady Industrial Area — rely on Globe Valve (Amine Service) for their petroleum refining operations. Vajra Industrial Solutions supplies Globe Valve (Amine Service), Ball Valve (Supercritical CO₂), Gate Valve (CO₂ Pipeline), Check Valve (CO₂ Compressor) for carbon capture & storage (ccs) projects across Karnataka, with full NACE MR0175 / ISO 15156 (sour CO₂) and ASME B16.34 compliance documentation — EN 10204 3.1 material test certificates, API 598 pressure test reports, and third-party inspection co-ordination available for every order.
Delivery to Mangalore
Vajra Industrial Solutions offers delivery to Mangalore in 3–7 business days. Emergency dispatch available for plant shutdowns and critical site requirements.
Also serving: MRPL Refinery, New Mangalore Port, Baikampady Industrial Area
FAQ — Carbon Capture & Storage (CCS) Valves in Mangalore
Do you supply carbon capture & storage (ccs) valves in Mangalore?
What certifications are required for carbon capture & storage (ccs) valves in Mangalore?
What is the delivery time for carbon capture & storage (ccs) valves to Mangalore?
Can carbon steel valves be used in CO₂ service?
What is the difference between CCS and carbon capture for enhanced oil recovery (CO₂-EOR)?
Other Application Guides for Mangalore
Get a Quote
Carbon Capture & Storage (CCS) Valves — Mangalore
Send your specification — quote within 24 hours with full documentation.
Standards
Product Categories