Nadiad · Carbon Capture & Storage (CCS)
Valves for Carbon Capture & Storage (CCS) — Nadiad
Nadiad is the heart of Gujarat's pharma belt — home to Sun Pharma, Zydus, and Alembic subsidiaries producing generic APIs and formulations that require sanitary SS 316 diaphragm valves, aseptic butterfly valves and ultra-clean fittings.
SS316L gate and globe valves for amine absorber CO₂ capture, Class 900 Duplex ball valves for supercritical CO₂ compression and transport, and NACE-compliant valves for CO₂ geological storage.
Carbon Capture & Storage (CCS) Valves — Available in Nadiad
Globe Valve (Amine Service)
Class 150 / 300Lean/rich amine absorber and stripper — hot amine (MEA/MDEA) is corrosive; SS316L with Stellite trim for erosion control
Ball Valve (Supercritical CO₂)
Class 600 / 900CO₂ compressor outlet and injection well isolation — supercritical CO₂ (> 73 bar) is an excellent solvent; seals must be CO₂-compatible
Gate Valve (CO₂ Pipeline)
Class 300 / 600 / 900CO₂ trunk pipeline isolation — API 6D full-bore gate valves; same specification as natural gas pipelines but with CO₂-compatible seals
Check Valve (CO₂ Compressor)
Class 300 / 600CO₂ compressor inter-stage and discharge back-flow prevention
Carbon Capture & Storage (CCS) Industry in Nadiad
Nadiad is the heart of Gujarat's pharma belt — home to Sun Pharma, Zydus, and Alembic subsidiaries producing generic APIs and formulations that require sanitary SS 316 diaphragm valves, aseptic butterfly valves and ultra-clean fittings.
Critical Valve Requirements
Why Nadiad's Pharmaceutical Sector Needs Carbon Capture & Storage (CCS) Valves
Nadiad is the heart of Gujarat's pharma belt — home to Sun Pharma, Zydus, and Alembic subsidiaries producing generic APIs and formulations that require sanitary SS 316 diaphragm valves, aseptic butterfly valves and ultra-clean fittings. Key facilities in the Nadiad area — including Anand–Nadiad Pharma Belt, Kheda GIDC, Charotar Pharmaceutical Cluster — rely on Globe Valve (Amine Service) for their pharmaceutical operations. Vajra Industrial Solutions supplies Globe Valve (Amine Service), Ball Valve (Supercritical CO₂), Gate Valve (CO₂ Pipeline), Check Valve (CO₂ Compressor) for carbon capture & storage (ccs) projects across Gujarat, with full NACE MR0175 / ISO 15156 (sour CO₂) and ASME B16.34 compliance documentation — EN 10204 3.1 material test certificates, API 598 pressure test reports, and third-party inspection co-ordination available for every order.
Delivery to Nadiad
Vajra Industrial Solutions offers same-day dispatch from Vadodara — Nadiad receives delivery in 1–3 business days. Emergency dispatch available for plant shutdowns and critical site requirements.
Also serving: Anand–Nadiad Pharma Belt, Kheda GIDC, Charotar Pharmaceutical Cluster
FAQ — Carbon Capture & Storage (CCS) Valves in Nadiad
Do you supply carbon capture & storage (ccs) valves in Nadiad?
What certifications are required for carbon capture & storage (ccs) valves in Nadiad?
What is the delivery time for carbon capture & storage (ccs) valves to Nadiad?
Can carbon steel valves be used in CO₂ service?
What is the difference between CCS and carbon capture for enhanced oil recovery (CO₂-EOR)?
Other Application Guides for Nadiad
Get a Quote
Carbon Capture & Storage (CCS) Valves — Nadiad
Send your specification — quote within 24 hours with full documentation.
Standards
Product Categories