Oslo · Carbon Capture & Storage (CCS)
Valves for Carbon Capture & Storage (CCS) — Oslo
Norway is Western Europe's top oil producer — Equinor, Aker Solutions, TechnipFMC and hundreds of offshore suppliers are based here.
SS316L gate and globe valves for amine absorber CO₂ capture, Class 900 Duplex ball valves for supercritical CO₂ compression and transport, and NACE-compliant valves for CO₂ geological storage.
Carbon Capture & Storage (CCS) Valves — Available in Oslo
Globe Valve (Amine Service)
Class 150 / 300Lean/rich amine absorber and stripper — hot amine (MEA/MDEA) is corrosive; SS316L with Stellite trim for erosion control
Ball Valve (Supercritical CO₂)
Class 600 / 900CO₂ compressor outlet and injection well isolation — supercritical CO₂ (> 73 bar) is an excellent solvent; seals must be CO₂-compatible
Gate Valve (CO₂ Pipeline)
Class 300 / 600 / 900CO₂ trunk pipeline isolation — API 6D full-bore gate valves; same specification as natural gas pipelines but with CO₂-compatible seals
Check Valve (CO₂ Compressor)
Class 300 / 600CO₂ compressor inter-stage and discharge back-flow prevention
Carbon Capture & Storage (CCS) Industry in Oslo
Norway is Western Europe's top oil producer — Equinor, Aker Solutions, TechnipFMC and hundreds of offshore suppliers are based here.
Critical Valve Requirements
Why Oslo's Oil & Gas (North Sea) Sector Needs Carbon Capture & Storage (CCS) Valves
Norway is Western Europe's top oil producer — Equinor, Aker Solutions, TechnipFMC and hundreds of offshore suppliers are based here. Key facilities in the Oslo area — including Stavanger Oil Hub, Bergen Offshore, Aker Solutions HQ — rely on Globe Valve (Amine Service) for their oil & gas (north sea) operations. Vajra Industrial Solutions supplies Globe Valve (Amine Service), Ball Valve (Supercritical CO₂), Gate Valve (CO₂ Pipeline), Check Valve (CO₂ Compressor) for carbon capture & storage (ccs) projects across Oslo, with full NACE MR0175 / ISO 15156 (sour CO₂) and ASME B16.34 compliance documentation — EN 10204 3.1 material test certificates, API 598 pressure test reports, and third-party inspection co-ordination available for every order.
Delivery to Oslo
Vajra Industrial Solutions offers export documentation and delivery to Oslo in 7–14 business days. Emergency dispatch available for plant shutdowns and critical site requirements.
Also serving: Stavanger Oil Hub, Bergen Offshore, Aker Solutions HQ
FAQ — Carbon Capture & Storage (CCS) Valves in Oslo
Do you supply carbon capture & storage (ccs) valves in Oslo?
What certifications are required for carbon capture & storage (ccs) valves in Oslo?
What is the delivery time for carbon capture & storage (ccs) valves to Oslo?
Can carbon steel valves be used in CO₂ service?
What is the difference between CCS and carbon capture for enhanced oil recovery (CO₂-EOR)?
Other Application Guides for Oslo
Get a Quote
Carbon Capture & Storage (CCS) Valves — Oslo
Send your specification — quote within 24 hours with full documentation.
Standards
Product Categories