Salem · Carbon Capture & Storage (CCS)
Valves for Carbon Capture & Storage (CCS) — Salem
Salem Steel Plant (SAIL) produces stainless steel — and Mettur's chemical and fertilizer complex generates consistent valve demand in north Tamil Nadu.
SS316L gate and globe valves for amine absorber CO₂ capture, Class 900 Duplex ball valves for supercritical CO₂ compression and transport, and NACE-compliant valves for CO₂ geological storage.
Carbon Capture & Storage (CCS) Valves — Available in Salem
Globe Valve (Amine Service)
Class 150 / 300Lean/rich amine absorber and stripper — hot amine (MEA/MDEA) is corrosive; SS316L with Stellite trim for erosion control
Ball Valve (Supercritical CO₂)
Class 600 / 900CO₂ compressor outlet and injection well isolation — supercritical CO₂ (> 73 bar) is an excellent solvent; seals must be CO₂-compatible
Gate Valve (CO₂ Pipeline)
Class 300 / 600 / 900CO₂ trunk pipeline isolation — API 6D full-bore gate valves; same specification as natural gas pipelines but with CO₂-compatible seals
Check Valve (CO₂ Compressor)
Class 300 / 600CO₂ compressor inter-stage and discharge back-flow prevention
Carbon Capture & Storage (CCS) Industry in Salem
Salem Steel Plant (SAIL) produces stainless steel — and Mettur's chemical and fertilizer complex generates consistent valve demand in north Tamil Nadu.
Critical Valve Requirements
Why Salem's Steel & Iron Sector Needs Carbon Capture & Storage (CCS) Valves
Salem Steel Plant (SAIL) produces stainless steel — and Mettur's chemical and fertilizer complex generates consistent valve demand in north Tamil Nadu. Key facilities in the Salem area — including Salem Steel Plant (SAIL), Bhavani Spinning Mills Belt, Mettur Dam Chemical Complex — rely on Globe Valve (Amine Service) for their steel & iron operations. Vajra Industrial Solutions supplies Globe Valve (Amine Service), Ball Valve (Supercritical CO₂), Gate Valve (CO₂ Pipeline), Check Valve (CO₂ Compressor) for carbon capture & storage (ccs) projects across Tamil Nadu, with full NACE MR0175 / ISO 15156 (sour CO₂) and ASME B16.34 compliance documentation — EN 10204 3.1 material test certificates, API 598 pressure test reports, and third-party inspection co-ordination available for every order.
Delivery to Salem
Vajra Industrial Solutions offers delivery to Salem in 3–7 business days. Emergency dispatch available for plant shutdowns and critical site requirements.
Also serving: Salem Steel Plant (SAIL), Bhavani Spinning Mills Belt, Mettur Dam Chemical Complex
FAQ — Carbon Capture & Storage (CCS) Valves in Salem
Do you supply carbon capture & storage (ccs) valves in Salem?
What certifications are required for carbon capture & storage (ccs) valves in Salem?
What is the delivery time for carbon capture & storage (ccs) valves to Salem?
Can carbon steel valves be used in CO₂ service?
What is the difference between CCS and carbon capture for enhanced oil recovery (CO₂-EOR)?
Other Application Guides for Salem
Get a Quote
Carbon Capture & Storage (CCS) Valves — Salem
Send your specification — quote within 24 hours with full documentation.
Standards
Product Categories