Tokyo · Carbon Capture & Storage (CCS)
Valves for Carbon Capture & Storage (CCS) — Tokyo
Japan's industrial base — Mitsubishi, JGC, and Toyo Engineering procure globally for mega-projects across Asia.
SS316L gate and globe valves for amine absorber CO₂ capture, Class 900 Duplex ball valves for supercritical CO₂ compression and transport, and NACE-compliant valves for CO₂ geological storage.
Carbon Capture & Storage (CCS) Valves — Available in Tokyo
Globe Valve (Amine Service)
Class 150 / 300Lean/rich amine absorber and stripper — hot amine (MEA/MDEA) is corrosive; SS316L with Stellite trim for erosion control
Ball Valve (Supercritical CO₂)
Class 600 / 900CO₂ compressor outlet and injection well isolation — supercritical CO₂ (> 73 bar) is an excellent solvent; seals must be CO₂-compatible
Gate Valve (CO₂ Pipeline)
Class 300 / 600 / 900CO₂ trunk pipeline isolation — API 6D full-bore gate valves; same specification as natural gas pipelines but with CO₂-compatible seals
Check Valve (CO₂ Compressor)
Class 300 / 600CO₂ compressor inter-stage and discharge back-flow prevention
Carbon Capture & Storage (CCS) Industry in Tokyo
Japan's industrial base — Mitsubishi, JGC, and Toyo Engineering procure globally for mega-projects across Asia.
Critical Valve Requirements
Why Tokyo's Semiconductor Sector Needs Carbon Capture & Storage (CCS) Valves
Japan's industrial base — Mitsubishi, JGC, and Toyo Engineering procure globally for mega-projects across Asia. Key facilities in the Tokyo area — including Yokohama Port, Kawasaki Industrial Belt, Chiba Chemical Complex — rely on Globe Valve (Amine Service) for their semiconductor operations. Vajra Industrial Solutions supplies Globe Valve (Amine Service), Ball Valve (Supercritical CO₂), Gate Valve (CO₂ Pipeline), Check Valve (CO₂ Compressor) for carbon capture & storage (ccs) projects across Tokyo, with full NACE MR0175 / ISO 15156 (sour CO₂) and ASME B16.34 compliance documentation — EN 10204 3.1 material test certificates, API 598 pressure test reports, and third-party inspection co-ordination available for every order.
Delivery to Tokyo
Vajra Industrial Solutions offers export documentation and delivery to Tokyo in 7–14 business days. Emergency dispatch available for plant shutdowns and critical site requirements.
Also serving: Yokohama Port, Kawasaki Industrial Belt, Chiba Chemical Complex
FAQ — Carbon Capture & Storage (CCS) Valves in Tokyo
Do you supply carbon capture & storage (ccs) valves in Tokyo?
What certifications are required for carbon capture & storage (ccs) valves in Tokyo?
What is the delivery time for carbon capture & storage (ccs) valves to Tokyo?
Can carbon steel valves be used in CO₂ service?
What is the difference between CCS and carbon capture for enhanced oil recovery (CO₂-EOR)?
Other Application Guides for Tokyo
Get a Quote
Carbon Capture & Storage (CCS) Valves — Tokyo
Send your specification — quote within 24 hours with full documentation.
Standards
Product Categories