Project & Industrial Supply

Valve Supplier for Woodside

Woodside Energy Group Ltd · Perth, Western Australia

Woodside Energy is Australia's largest oil and gas company and one of the world's leading LNG producers. Woodside operates the North West Shelf LNG (the longest-running LNG export facility in Australia), Pluto LNG, and the Wheatstone LNG project (in joint venture). Following the BHP merger, Woodside also operates offshore fields in the Gulf of Mexico, North Sea, and Senegal. All Australian LNG facilities require AS 4041 and API-certified valves with full third-party inspection documentation.

Independent Reference — Not Affiliated with WoodsideThis page is published by Vajra Industrial Solutions as a reference for valve procurement for Woodside projects. Vajra Industrial Solutions is not affiliated with, endorsed by, or a subsidiary of Woodside Energy Group Ltd. All company names and trademarks are the property of their respective owners. Vendor registration and qualification requirements must be verified directly with Woodside.

Key Facilities — Woodside

North West Shelf LNG, Karratha, Western Australia — 16.9 MTPA (6 trains)

Pluto LNG, Karratha, Western Australia — 4.9 MTPA

Wheatstone LNG, Onslow, Western Australia — 8.9 MTPA

Sangomar FPSO, Senegal — deepwater offshore

Scarborough Gas Field — future development, offshore WA

Shenzi FPSO, Gulf of Mexico — ex-BHP asset

Valve Applications at Woodside

AS 4041 and API 6D certified ball valves and gate valves for LNG service

Cryogenic LNG valves with extended bonnets and PCTFE seats for -196°C service

NACE MR0175 valves for offshore sour gas service

API 607 fire-safe valves for all hydrocarbon handling

Safety relief valves per API 526 for pressure vessel protection

Subsea valves for deep-water Scarborough and Browse Basin development

Certification Requirements for Woodside Supply

AS 4041 (Australian pressure piping standard) for domestic projectsAPI 6D, API 607, API 6FA certificationNACE MR0175 for sour serviceWoodside Technical Standards (WDS) complianceThird-party inspection by Lloyd's Register, Bureau Veritas, or Woodside-nominated TPIEN 10204 3.2 material certification for critical valves

Woodside procures valves through EPC contractors (KBR, Bechtel, JKC Australia LNG) and directly for brownfield maintenance. Vendors must be pre-qualified through Woodside's Vendor Registration process. Australian LNG projects require AS 4041 compliance alongside API standards.

Valve Categories We Supply for Woodside Projects

What Vajra Offers for Woodside Supply

Full Certification Documentation

EN 10204 3.1/3.2 MTCs, hydro test certificates, dimensional reports, NDE results — all supplied as standard.

Third-Party Inspection Welcome

We accept TPI at our works by CEIL, TÜV, Lloyd's, Bureau Veritas, SGS, DNV, and other approved agencies.

Owner Piping Class Compliance

We understand Woodside's piping material specifications and supply valves that comply without re-engineering.

Competitive Project Pricing

Volume-based pricing for project quantities. Rate contract arrangements for O&M (operations & maintenance) supply.

Frequently Asked Questions — Woodside Valve Supply

Can Vajra supply valves directly to Woodside projects?
Yes. Vajra Industrial Solutions can supply valves directly to Woodside facilities and through EPC contractors executing Woodside projects. We have experience with the documentation, inspection, and certification requirements typical for LNG, Oil & Gas, Offshore projects.
What certifications are needed for valves used in Woodside facilities?
Woodside typically requires: AS 4041 (Australian pressure piping standard) for domestic projects, API 6D, API 607, API 6FA certification, NACE MR0175 for sour service, Woodside Technical Standards (WDS) compliance. All Vajra-supplied valves can be provided with these certifications as standard.
How quickly can Vajra deliver valves for Woodside projects?
Stocked items are dispatched same day or next day from Vadodara. Custom or large-bore valves typically require 4–12 weeks depending on specifications. Emergency supply for plant shutdowns is given priority. We serve clients across India and internationally.
Does Vajra accept third-party inspection for Woodside projects?
Yes. We welcome third-party inspection by any NABL/ILAC-accredited or internationally recognized TPI agency. We coordinate documentation, witness testing, and dispatch according to the inspection plan.

Other Companies We Supply

Ready to Supply Woodside Projects?

Share your MR (Material Requisition), valve BOM, or piping class list — we'll respond with pricing and compliance confirmation within 24 hours.