Taiwan
Export Supply

Gate Valves for Taiwan

Gate Valves export to Taiwan (East Asia) — API 6D / ASME B16.34 certified, supplied to Taiwan operators and EPC projects with full export documentation and a 24-hour quote.

Who supplies gate valves to Taiwan?

Vajra Industrial Solutions is a valve manufacturer exporting gate valves to Taiwan to API 6D and ASME B16.34, with full export documentation (certificate of origin, third-party inspection, EN 10204 3.1 MTCs). Shipments to Taiwan dispatched within 5–7 business days. Air freight to Taipei Taoyuan (TPE) or Taichung (RMQ): 3–4 days transit via Hong Kong or Singapore. Sea freight via JNPT to Kaohsiung Port: approximately 12–16 days. Taiwan customs (Customs Administration, MOFIT) require commercial invoice, packing list, bill of lading, and Form A (GSP certificate of origin). ATA carnet accepted for temporary imports of sample valves.

Taiwan Operators & EPC End-Users

CPC Corporation TaiwanFormosa Plastics Corporation (FPC)Formosa Petrochemical Corporation (FPCC Mailiao)TSMC (semiconductor ultrapure water)CSBC Corporation (shipbuilding)Taipower (power generation)China Steel Corporation (Kaohsiung)

Key Gate Valves Markets in Taiwan

  • Oil Refining (CPC Corporation Taiwan)
  • Petrochemical (Formosa Plastics, FPCC Mailiao)
  • LNG Import (CPC, TPCC - major LNG consumers)
  • Semiconductor & Electronics Manufacturing
  • Shipbuilding (CSBC, CSSC)
  • Power Generation (Taipower, renewable transition)

Vajra Gate Valves

Robust gate valves for full-flow isolation and on-off service in various industrial systems.

See the full Gate Valves range

Gate Valves delivery across Taiwan

Other valves for Taiwan

Gate Valves export to other countries

Reviewed by Product Engineering, Vajra Industrial SolutionsDiscipline: Valve Product EngineeringLast reviewed: 20 June 2026

Connected Engineering

Standards
Products

Exporting gate valves to Taiwan?

Send your enquiry or line list — we supply gate valves to Taiwan with API 6D / ASME B16.34 certification and full export documentation in 24 hours.

Relevant Products

Engineering references