Gdańsk · Carbon Capture & Storage (CCS)
Valves for Carbon Capture & Storage (CCS) — Gdańsk
Gdańsk is Poland's refining and offshore fabrication capital — PKN Orlen's Gdańsk Refinery (the merged Lotos facility, 10.5 MTPA) is one of the largest in Central Europe, while the Remontowa and CRIST shipyards build FSO tankers, jack-up rigs, and offshore structures for global clients. Polskie LNG at Świnoujście (200 km west) is Poland's main LNG import terminal. Vajra Industrial Solutions supplies PED 2014/68/EU certified ball valves, gate valves, and butterfly valves to PKN Orlen Gdańsk maintenance and turnaround teams, and to Remontowa Shipbuilding for offshore projects — EN 10204 3.2 MTCs, CE Declarations of Conformity, and Polish customs (Intrastat) documentation provided.
SS316L gate and globe valves for amine absorber CO₂ capture, Class 900 Duplex ball valves for supercritical CO₂ compression and transport, and NACE-compliant valves for CO₂ geological storage.
Carbon Capture & Storage (CCS) Valves — Available in Gdańsk
Globe Valve (Amine Service)
Class 150 / 300Lean/rich amine absorber and stripper — hot amine (MEA/MDEA) is corrosive; SS316L with Stellite trim for erosion control
Ball Valve (Supercritical CO₂)
Class 600 / 900CO₂ compressor outlet and injection well isolation — supercritical CO₂ (> 73 bar) is an excellent solvent; seals must be CO₂-compatible
Gate Valve (CO₂ Pipeline)
Class 300 / 600 / 900CO₂ trunk pipeline isolation — API 6D full-bore gate valves; same specification as natural gas pipelines but with CO₂-compatible seals
Check Valve (CO₂ Compressor)
Class 300 / 600CO₂ compressor inter-stage and discharge back-flow prevention
Carbon Capture & Storage (CCS) Industry in Gdańsk
Gdańsk is Poland's refining and offshore fabrication capital — PKN Orlen's Gdańsk Refinery (the merged Lotos facility, 10.5 MTPA) is one of the largest in Central Europe, while the Remontowa and CRIST shipyards build FSO tankers, jack-up rigs, and offshore structures for global clients. Polskie LNG at Świnoujście (200 km west) is Poland's main LNG import terminal. Vajra Industrial Solutions supplies PED 2014/68/EU certified ball valves, gate valves, and butterfly valves to PKN Orlen Gdańsk maintenance and turnaround teams, and to Remontowa Shipbuilding for offshore projects — EN 10204 3.2 MTCs, CE Declarations of Conformity, and Polish customs (Intrastat) documentation provided.
Critical Valve Requirements
Why Gdańsk's Oil Refining (PKN Orlen Gdańsk — formerly Lotos) Sector Needs Carbon Capture & Storage (CCS) Valves
Gdańsk is Poland's refining and offshore fabrication capital — PKN Orlen's Gdańsk Refinery (the merged Lotos facility, 10.5 MTPA) is one of the largest in Central Europe, while the Remontowa and CRIST shipyards build FSO tankers, jack-up rigs, and offshore structures for global clients. Polskie LNG at Świnoujście (200 km west) is Poland's main LNG import terminal. Vajra Industrial Solutions supplies PED 2014/68/EU certified ball valves, gate valves, and butterfly valves to PKN Orlen Gdańsk maintenance and turnaround teams, and to Remontowa Shipbuilding for offshore projects — EN 10204 3.2 MTCs, CE Declarations of Conformity, and Polish customs (Intrastat) documentation provided. Key facilities in the Gdańsk area — including PKN Orlen Gdańsk Refinery (10.5 MTPA capacity), Remontowa Shipbuilding (FSO, FPSO fabrication), CRIST Shipyard (offshore structures) — rely on Globe Valve (Amine Service) for their oil refining (pkn orlen gdańsk — formerly lotos) operations. Vajra Industrial Solutions supplies Globe Valve (Amine Service), Ball Valve (Supercritical CO₂), Gate Valve (CO₂ Pipeline), Check Valve (CO₂ Compressor) for carbon capture & storage (ccs) projects across Pomerania, with full NACE MR0175 / ISO 15156 (sour CO₂) and ASME B16.34 compliance documentation — EN 10204 3.1 material test certificates, API 598 pressure test reports, and third-party inspection co-ordination available for every order.
Delivery to Gdańsk
Vajra Industrial Solutions offers export documentation and delivery to Gdańsk in 7–14 business days. Emergency dispatch available for plant shutdowns and critical site requirements.
Also serving: PKN Orlen Gdańsk Refinery (10.5 MTPA capacity), Remontowa Shipbuilding (FSO, FPSO fabrication), CRIST Shipyard (offshore structures), DCT Gdańsk container terminal, Baltic Pipe landfall (Danish gas to Poland)
FAQ — Carbon Capture & Storage (CCS) Valves in Gdańsk
Do you supply carbon capture & storage (ccs) valves in Gdańsk?
What certifications are required for carbon capture & storage (ccs) valves in Gdańsk?
What is the delivery time for carbon capture & storage (ccs) valves to Gdańsk?
Can carbon steel valves be used in CO₂ service?
What is the difference between CCS and carbon capture for enhanced oil recovery (CO₂-EOR)?
Other Application Guides for Gdańsk
Get a Quote
Carbon Capture & Storage (CCS) Valves — Gdańsk
Send your specification — quote within 24 hours with full documentation.
Standards
Product Categories