Gdańsk · Compressed Gas & CNG Systems
Valves for Compressed Gas & CNG Systems — Gdańsk
Gdańsk is Poland's refining and offshore fabrication capital — PKN Orlen's Gdańsk Refinery (the merged Lotos facility, 10.5 MTPA) is one of the largest in Central Europe, while the Remontowa and CRIST shipyards build FSO tankers, jack-up rigs, and offshore structures for global clients. Polskie LNG at Świnoujście (200 km west) is Poland's main LNG import terminal. Vajra Industrial Solutions supplies PED 2014/68/EU certified ball valves, gate valves, and butterfly valves to PKN Orlen Gdańsk maintenance and turnaround teams, and to Remontowa Shipbuilding for offshore projects — EN 10204 3.2 MTCs, CE Declarations of Conformity, and Polish customs (Intrastat) documentation provided.
Class 2500 and Class 1500 CNG ball valves with PNGRB approval, IS 15901 compliant gate and ball valves for city gas distribution, and high-pressure compressed air/nitrogen valves for industrial CNG systems.
Compressed Gas & CNG Systems Valves — Available in Gdańsk
CNG Ball Valve (Class 2500)
Class 1500 / 2500 (PN 250 / PN 420)CNG station dispenser isolation and cascade storage — 200–250 bar natural gas; fire-safe, anti-static, full-bore; PNGRB approved
Gate Valve (City Gas Distribution)
Class 150 / 300 (ASME); PN 16 / PN 40 (EN)Sectional valve on medium and low-pressure gas distribution mains — IS 15901 compliance; PNGRB authorization
Safety Relief Valve (CNG)
Class 2500CNG storage cascade and mother station overpressure protection — set pressure up to 250 bar
Ball Valve (Industrial Compressed Air/N₂)
Class 150 / 300 / 600Compressed air systems (7–14 bar) and nitrogen bottles/manifolds (150–200 bar) — economy grade for inert gas
Compressed Gas & CNG Systems Industry in Gdańsk
Gdańsk is Poland's refining and offshore fabrication capital — PKN Orlen's Gdańsk Refinery (the merged Lotos facility, 10.5 MTPA) is one of the largest in Central Europe, while the Remontowa and CRIST shipyards build FSO tankers, jack-up rigs, and offshore structures for global clients. Polskie LNG at Świnoujście (200 km west) is Poland's main LNG import terminal. Vajra Industrial Solutions supplies PED 2014/68/EU certified ball valves, gate valves, and butterfly valves to PKN Orlen Gdańsk maintenance and turnaround teams, and to Remontowa Shipbuilding for offshore projects — EN 10204 3.2 MTCs, CE Declarations of Conformity, and Polish customs (Intrastat) documentation provided.
Critical Valve Requirements
Why Gdańsk's Oil Refining (PKN Orlen Gdańsk — formerly Lotos) Sector Needs Compressed Gas & CNG Systems Valves
Gdańsk is Poland's refining and offshore fabrication capital — PKN Orlen's Gdańsk Refinery (the merged Lotos facility, 10.5 MTPA) is one of the largest in Central Europe, while the Remontowa and CRIST shipyards build FSO tankers, jack-up rigs, and offshore structures for global clients. Polskie LNG at Świnoujście (200 km west) is Poland's main LNG import terminal. Vajra Industrial Solutions supplies PED 2014/68/EU certified ball valves, gate valves, and butterfly valves to PKN Orlen Gdańsk maintenance and turnaround teams, and to Remontowa Shipbuilding for offshore projects — EN 10204 3.2 MTCs, CE Declarations of Conformity, and Polish customs (Intrastat) documentation provided. Key facilities in the Gdańsk area — including PKN Orlen Gdańsk Refinery (10.5 MTPA capacity), Remontowa Shipbuilding (FSO, FPSO fabrication), CRIST Shipyard (offshore structures) — rely on CNG Ball Valve (Class 2500) for their oil refining (pkn orlen gdańsk — formerly lotos) operations. Vajra Industrial Solutions supplies CNG Ball Valve (Class 2500), Gate Valve (City Gas Distribution), Safety Relief Valve (CNG), Ball Valve (Industrial Compressed Air/N₂) for compressed gas & cng systems projects across Pomerania, with full IS 15901 (CNG/CGD Valves) and PNGRB Regulations compliance documentation — EN 10204 3.1 material test certificates, API 598 pressure test reports, and third-party inspection co-ordination available for every order.
Delivery to Gdańsk
Vajra Industrial Solutions offers export documentation and delivery to Gdańsk in 7–14 business days. Emergency dispatch available for plant shutdowns and critical site requirements.
Also serving: PKN Orlen Gdańsk Refinery (10.5 MTPA capacity), Remontowa Shipbuilding (FSO, FPSO fabrication), CRIST Shipyard (offshore structures), DCT Gdańsk container terminal, Baltic Pipe landfall (Danish gas to Poland)
FAQ — Compressed Gas & CNG Systems Valves in Gdańsk
Do you supply compressed gas & cng systems valves in Gdańsk?
What certifications are required for compressed gas & cng systems valves in Gdańsk?
What is the delivery time for compressed gas & cng systems valves to Gdańsk?
What is PNGRB approval and which CNG valves require it?
What pressure class do I need for CNG station ball valves?
Other Application Guides for Gdańsk
Get a Quote
Compressed Gas & CNG Systems Valves — Gdańsk
Send your specification — quote within 24 hours with full documentation.
Standards
Product Categories