Vijayawada · Carbon Capture & Storage (CCS)
Valves for Carbon Capture & Storage (CCS) — Vijayawada
AP's commercial capital and home to NTPC Vijayawada thermal plant — the new capital Amaravati construction also drives MEP and water valve demand.
SS316L gate and globe valves for amine absorber CO₂ capture, Class 900 Duplex ball valves for supercritical CO₂ compression and transport, and NACE-compliant valves for CO₂ geological storage.
Carbon Capture & Storage (CCS) Valves — Available in Vijayawada
Globe Valve (Amine Service)
Class 150 / 300Lean/rich amine absorber and stripper — hot amine (MEA/MDEA) is corrosive; SS316L with Stellite trim for erosion control
Ball Valve (Supercritical CO₂)
Class 600 / 900CO₂ compressor outlet and injection well isolation — supercritical CO₂ (> 73 bar) is an excellent solvent; seals must be CO₂-compatible
Gate Valve (CO₂ Pipeline)
Class 300 / 600 / 900CO₂ trunk pipeline isolation — API 6D full-bore gate valves; same specification as natural gas pipelines but with CO₂-compatible seals
Check Valve (CO₂ Compressor)
Class 300 / 600CO₂ compressor inter-stage and discharge back-flow prevention
Carbon Capture & Storage (CCS) Industry in Vijayawada
AP's commercial capital and home to NTPC Vijayawada thermal plant — the new capital Amaravati construction also drives MEP and water valve demand.
Critical Valve Requirements
Why Vijayawada's Power Generation Sector Needs Carbon Capture & Storage (CCS) Valves
AP's commercial capital and home to NTPC Vijayawada thermal plant — the new capital Amaravati construction also drives MEP and water valve demand. Key facilities in the Vijayawada area — including NTPC Vijayawada, AP Genco Thermal Plants, Vijayawada Industrial Area — rely on Globe Valve (Amine Service) for their power generation operations. Vajra Industrial Solutions supplies Globe Valve (Amine Service), Ball Valve (Supercritical CO₂), Gate Valve (CO₂ Pipeline), Check Valve (CO₂ Compressor) for carbon capture & storage (ccs) projects across Andhra Pradesh, with full NACE MR0175 / ISO 15156 (sour CO₂) and ASME B16.34 compliance documentation — EN 10204 3.1 material test certificates, API 598 pressure test reports, and third-party inspection co-ordination available for every order.
Delivery to Vijayawada
Vajra Industrial Solutions offers delivery to Vijayawada in 3–7 business days. Emergency dispatch available for plant shutdowns and critical site requirements.
Also serving: NTPC Vijayawada, AP Genco Thermal Plants, Vijayawada Industrial Area
FAQ — Carbon Capture & Storage (CCS) Valves in Vijayawada
Do you supply carbon capture & storage (ccs) valves in Vijayawada?
What certifications are required for carbon capture & storage (ccs) valves in Vijayawada?
What is the delivery time for carbon capture & storage (ccs) valves to Vijayawada?
Can carbon steel valves be used in CO₂ service?
What is the difference between CCS and carbon capture for enhanced oil recovery (CO₂-EOR)?
Other Application Guides for Vijayawada
Get a Quote
Carbon Capture & Storage (CCS) Valves — Vijayawada
Send your specification — quote within 24 hours with full documentation.
Standards
Product Categories