LNG / Cryogenic Natural Gas service
Service Selection

Butterfly Valves for LNG / Cryogenic Natural Gas Service

Which butterfly valves configuration suits LNG / Cryogenic Natural Gas, in which material, to which standard — from real service data, with the pitfalls flagged.

Which butterfly valves for LNG / Cryogenic Natural Gas?

Cryogenic butterfly valve (triple-offset) - LNG loading arms and large bore cryogenic pipelines Typical service window: 0.1–100 bar (atmospheric storage to HP pumped systems), -162°C to ambient.

Recommended Configurations

Cryogenic butterfly valve (triple-offset)

LNG loading arms and large bore cryogenic pipelines

Body Material for LNG / Cryogenic Natural Gas

Rated from real compatibility data - click any material for the full decision page.

Governing Standards for LNG / Cryogenic Natural Gas Service

BS 6364 - Cryogenic valve specificationISO 21011 - Cryogenic ball valvesEN 1626 - Cryogenic valvesASME B31.3 Low Temperature Annex MNFPA 59A - LNG facilities

What to Avoid in LNG / Cryogenic Natural Gas Service

  • Any non-impact-tested carbon steel valve
  • Valves without extended bonnet in submerged or contact cryogenic service
  • Elastomer-seated valves (most elastomers embrittle at -162°C)

Service Considerations

  • Extended bonnet: minimum 150mm to protect stem packing from cryogenic temperature
  • Thermal cycling test required per BS 6364
  • Vacuum-insulated pipework may be used for long runs
  • Blowdown of liquid trapped in valve body - thermal expansion relief essential
  • All materials must have full material traceability (3.1 certs minimum)

Other valve types for LNG / Cryogenic Natural Gas

Butterfly Valves for other services

Reviewed by Process Engineering, Vajra Industrial SolutionsDiscipline: Process & Fluid Service EngineeringLast reviewed: 20 June 2026

Connected Engineering

Need butterfly valves for LNG / Cryogenic Natural Gas service?

Send your conditions - we confirm the configuration and material for LNG / Cryogenic Natural Gas and quote with full certification in 24 hours.

Relevant Products

Engineering references