Gate Valves for ConocoPhillips
Supplying gate valves for ConocoPhillips (Oil & Gas E&P, LNG, Midstream) projects — manufactured to the standards and certification their procurement requires, with full documentation and a 24-hour quote.
Can Vajra supply gate valves for ConocoPhillips projects?
Yes. Vajra Industrial Solutions is a valve manufacturer supplying gate valves to API 6D and ASME B16.34, built to the certification typical of ConocoPhillips (ConocoPhillips Company, Houston, Texas, USA) procurement in the Oil & Gas E&P, LNG, Midstream sector. ConocoPhillips procures through approved EPC contractors (Bechtel, KBR, McDermott) and directly for operational spend. Alaska projects have additional requirements for cold weather insulation and freeze protection of valve bonnets and actuators.
Certification ConocoPhillips Procurement Expects
Typical documentation and compliance for Oil & Gas E&P, LNG, Midstream valve procurement — supplied as standard with every Vajra order.
- ConocoPhillips COPO (ConocoPhillips Specification) compliance
- API 6D, API 607, API 6FA certification
- A352 LCC low-temperature impact tested materials for Alaska
- NORSOK M-710 / M-650 for Norway operations
- NACE MR0175 for sour service
- AS 4041 for Australian LNG projects
Where Gate Valves Serve ConocoPhillips Operations
- API 6D valves for Alaska North Slope pipeline and processing plants
- A352 LCC cryogenic valves for -46°C Arctic service in Alaska
- NORSOK M-710 valves for Norway Ekofisk and Tor field operations
- LNG service cryogenic ball valves for Darwin LNG and Barossa
- NACE MR0175 sour service valves for high H₂S gas fields
- API 607 fire-safe valves for offshore platform hydrocarbon service
Vajra Gate Valves
Robust gate valves for full-flow isolation and on-off service in various industrial systems.
See the full Gate Valves rangeOther valves for ConocoPhillips
Gate Valves for other operators & EPCs
Connected Engineering
Supplying gate valves for a ConocoPhillips project?
Send your valve schedule, tag list or datasheet — we quote all gate valves to ConocoPhillips specification with full certification in 24 hours.