Visakhapatnam · Carbon Capture & Storage (CCS)
Valves for Carbon Capture & Storage (CCS) — Visakhapatnam
Visakhapatnam hosts HPCL's largest refinery complex, RINL Vizag Steel Plant and a major deepwater port — one of India's top valve procurement hubs.
SS316L gate and globe valves for amine absorber CO₂ capture, Class 900 Duplex ball valves for supercritical CO₂ compression and transport, and NACE-compliant valves for CO₂ geological storage.
Carbon Capture & Storage (CCS) Valves — Available in Visakhapatnam
Globe Valve (Amine Service)
Class 150 / 300Lean/rich amine absorber and stripper — hot amine (MEA/MDEA) is corrosive; SS316L with Stellite trim for erosion control
Ball Valve (Supercritical CO₂)
Class 600 / 900CO₂ compressor outlet and injection well isolation — supercritical CO₂ (> 73 bar) is an excellent solvent; seals must be CO₂-compatible
Gate Valve (CO₂ Pipeline)
Class 300 / 600 / 900CO₂ trunk pipeline isolation — API 6D full-bore gate valves; same specification as natural gas pipelines but with CO₂-compatible seals
Check Valve (CO₂ Compressor)
Class 300 / 600CO₂ compressor inter-stage and discharge back-flow prevention
Carbon Capture & Storage (CCS) Industry in Visakhapatnam
Visakhapatnam hosts HPCL's largest refinery complex, RINL Vizag Steel Plant and a major deepwater port — one of India's top valve procurement hubs.
Critical Valve Requirements
Why Visakhapatnam's Steel & Metals Sector Needs Carbon Capture & Storage (CCS) Valves
Visakhapatnam hosts HPCL's largest refinery complex, RINL Vizag Steel Plant and a major deepwater port — one of India's top valve procurement hubs. Key facilities in the Visakhapatnam area — including HPCL Refinery Visakha, Visakhapatnam Port, RINL Vizag Steel Plant — rely on Globe Valve (Amine Service) for their steel & metals operations. Vajra Industrial Solutions supplies Globe Valve (Amine Service), Ball Valve (Supercritical CO₂), Gate Valve (CO₂ Pipeline), Check Valve (CO₂ Compressor) for carbon capture & storage (ccs) projects across Andhra Pradesh, with full NACE MR0175 / ISO 15156 (sour CO₂) and ASME B16.34 compliance documentation — EN 10204 3.1 material test certificates, API 598 pressure test reports, and third-party inspection co-ordination available for every order.
Delivery to Visakhapatnam
Vajra Industrial Solutions offers delivery to Visakhapatnam in 3–7 business days. Emergency dispatch available for plant shutdowns and critical site requirements.
Also serving: HPCL Refinery Visakha, Visakhapatnam Port, RINL Vizag Steel Plant
FAQ — Carbon Capture & Storage (CCS) Valves in Visakhapatnam
Do you supply carbon capture & storage (ccs) valves in Visakhapatnam?
What certifications are required for carbon capture & storage (ccs) valves in Visakhapatnam?
What is the delivery time for carbon capture & storage (ccs) valves to Visakhapatnam?
Can carbon steel valves be used in CO₂ service?
What is the difference between CCS and carbon capture for enhanced oil recovery (CO₂-EOR)?
Other Application Guides for Visakhapatnam
Get a Quote
Carbon Capture & Storage (CCS) Valves — Visakhapatnam
Send your specification — quote within 24 hours with full documentation.
Standards
Product Categories