Naphtha (Light / Heavy Naphtha) service
Service Selection

Check Valves for Naphtha (Light / Heavy Naphtha) Service

Which check valves configuration suits Naphtha (Light / Heavy Naphtha) (C₅–C₁₂ hydrocarbons), in which material, to which standard — from real service data, with the pitfalls flagged.

Which check valves for Naphtha (Light / Heavy Naphtha)?

Check Valve (dual-plate or swing) - Pump protection on naphtha transfer pumps and reformer charge pumps Typical service window: 1–35 barg (storage to reformer operating pressure), Ambient to 550°C (catalytic reformer).

Recommended Configurations

Check Valve (dual-plate or swing)

Pump protection on naphtha transfer pumps and reformer charge pumps

Body Material for Naphtha (Light / Heavy Naphtha)

Rated from real compatibility data - click any material for the full decision page.

Governing Standards for Naphtha (Light / Heavy Naphtha) Service

API 607 (fire-safe)API 6DASME B16.34API 941 (Nelson curves for reformer H₂ service)OISD-118 (India petroleum facility safety)ATEX 2014/34/EU

What to Avoid in Naphtha (Light / Heavy Naphtha) Service

  • EPDM or NBR-seated valves in naphtha service
  • Non-fire-safe valves in ATEX Zone 1 areas

Service Considerations

  • Fire-safe API 607 design mandatory in all ATEX-classified naphtha process and storage areas
  • Catalytic reformer service: high temperature + H₂ - API 941 Nelson curve compliance required for carbon and Cr-Mo steel valves
  • ESD valves on naphtha storage tanks - OISD-118 requirement for Indian petroleum facilities
  • PTFE or Viton seals only - EPDM and NBR swell in naphtha

Other valve types for Naphtha (Light / Heavy Naphtha)

Check Valves for other services

Reviewed by Process Engineering, Vajra Industrial SolutionsDiscipline: Process & Fluid Service EngineeringLast reviewed: 20 June 2026

Connected Engineering

Need check valves for Naphtha (Light / Heavy Naphtha) service?

Send your conditions - we confirm the configuration and material for Naphtha (Light / Heavy Naphtha) and quote with full certification in 24 hours.

Relevant Products

Engineering references