Guwahati · Carbon Capture & Storage (CCS)
Valves for Carbon Capture & Storage (CCS) — Guwahati
Gateway to Northeast India — OIL's Assam fields, IOCL Bongaigaon refinery and ONGC projects require continuous valve supply.
SS316L gate and globe valves for amine absorber CO₂ capture, Class 900 Duplex ball valves for supercritical CO₂ compression and transport, and NACE-compliant valves for CO₂ geological storage.
Carbon Capture & Storage (CCS) Valves — Available in Guwahati
Globe Valve (Amine Service)
Class 150 / 300Lean/rich amine absorber and stripper — hot amine (MEA/MDEA) is corrosive; SS316L with Stellite trim for erosion control
Ball Valve (Supercritical CO₂)
Class 600 / 900CO₂ compressor outlet and injection well isolation — supercritical CO₂ (> 73 bar) is an excellent solvent; seals must be CO₂-compatible
Gate Valve (CO₂ Pipeline)
Class 300 / 600 / 900CO₂ trunk pipeline isolation — API 6D full-bore gate valves; same specification as natural gas pipelines but with CO₂-compatible seals
Check Valve (CO₂ Compressor)
Class 300 / 600CO₂ compressor inter-stage and discharge back-flow prevention
Carbon Capture & Storage (CCS) Industry in Guwahati
Gateway to Northeast India — OIL's Assam fields, IOCL Bongaigaon refinery and ONGC projects require continuous valve supply.
Critical Valve Requirements
Why Guwahati's Oil & Gas (Assam Fields) Sector Needs Carbon Capture & Storage (CCS) Valves
Gateway to Northeast India — OIL's Assam fields, IOCL Bongaigaon refinery and ONGC projects require continuous valve supply. Key facilities in the Guwahati area — including IOCL Refinery Bongaigaon, OIL Duliajan, Namrup Fertilizer Plant — rely on Globe Valve (Amine Service) for their oil & gas (assam fields) operations. Vajra Industrial Solutions supplies Globe Valve (Amine Service), Ball Valve (Supercritical CO₂), Gate Valve (CO₂ Pipeline), Check Valve (CO₂ Compressor) for carbon capture & storage (ccs) projects across Assam, with full NACE MR0175 / ISO 15156 (sour CO₂) and ASME B16.34 compliance documentation — EN 10204 3.1 material test certificates, API 598 pressure test reports, and third-party inspection co-ordination available for every order.
Delivery to Guwahati
Vajra Industrial Solutions offers delivery to Guwahati in 3–7 business days. Emergency dispatch available for plant shutdowns and critical site requirements.
Also serving: IOCL Refinery Bongaigaon, OIL Duliajan, Namrup Fertilizer Plant
FAQ — Carbon Capture & Storage (CCS) Valves in Guwahati
Do you supply carbon capture & storage (ccs) valves in Guwahati?
What certifications are required for carbon capture & storage (ccs) valves in Guwahati?
What is the delivery time for carbon capture & storage (ccs) valves to Guwahati?
Can carbon steel valves be used in CO₂ service?
What is the difference between CCS and carbon capture for enhanced oil recovery (CO₂-EOR)?
Other Application Guides for Guwahati
Get a Quote
Carbon Capture & Storage (CCS) Valves — Guwahati
Send your specification — quote within 24 hours with full documentation.
Standards
Product Categories